Artificial intelligence infrastructure · Northeast Brazil

The data is yours and it stays here. The energy that moves it is not leaving either.

Data sovereignty with energy of our own. We are building artificial intelligence compute on Brazilian soil, in a place chosen for its sun, wind, water for cooling and people to run it.

Wind and solar generation curtailed for lack of transmission
Brazil · January to April 2026 · average MW
79%
of it in the Northeast
Energy delivered to the grid
Energy generated and discarded

Source: National Electric System Operator data compiled by the sector press, January to April 2026. Wind: 1,806 average MW curtailed. Solar: 1,037 average MW.

2.843
average MW of clean energy curtailed nationwide in four months
79%
of the loss concentrated in a single region, the Northeast
350 W
per accelerator in our architecture, half the draw of the training standard
100%
of processing on Brazilian soil, under Brazilian law
Wind and sun
The region generates more than the grid can carry away.
Cooling
Heat is the physical ceiling of any compute plant.
Compute
The load comes to the energy, and what leaves here is data, not megawatts.
The thesis

Data sovereignty costs less where the energy is stranded.

Processing sensitive data abroad stopped being a technical detail and became a contract risk. The catch is that bringing the processing home usually costs more, because energy is the largest line in any data center bill. That is exactly where the equation turns in our favour.

Between January and April this year Brazil curtailed 2,843 average MW of wind and solar generation for lack of transmission, and 79% of that happened in the Northeast. Clean energy, generated, and switched off by order of the grid operator. Transmitting it costs billions and takes years. Putting the load next to it costs a fraction.

That is why Buobe Cloud is not being assembled just anywhere. It is being assembled where there is surplus energy, water for cooling, established industrial infrastructure and qualified people to operate it. This is not regional rhetoric, it is the requirement list of a compute plant.

Data sovereignty

Processing on Brazilian infrastructure, under Brazilian data protection law. For anyone handling patient, student or citizen data, that stopped being a preference and became a contract requirement.

Priced in reais, and not only in reais

The base currency is the Brazilian real, with no exchange rate exposure buried in next month's invoice. Foreign institutions or companies that want to research and develop with us in Brazil are not blocked by currency: we work with more than one.

Dedicated Buobe Cloud capacity

Reserved machines, with real isolation and not only logical separation. That is what allows signing a service level commitment with customers who audit.

Buobe already runs AI in production

Semantic search, classification, translation and model fine tuning running every day, for years, in our own operation. We are not learning on your project: the machine arrives with people who know how to run it.

See it running at buobe.com

Where we are now

We are building stage one, and it already has a customer on our side.

We will not announce a data center that does not exist yet. Stage one is the plant that serves Buobe's own operation, the first partners, and academic research in the idle window. It is sized to prove the operation, not to impress with a number.

Stage two is the expansion, and it grows out of stage one: every contract on this list defines the size of the next. Joining now means price and terms set before capacity exists, and migrating first when it grows.

ItemPhase one
RegionNortheast Brazil, in an area with a renewable energy matrix, water available for cooling, established industrial infrastructure and a qualified workforce
ArchitectureNVIDIA L40S 48 GB accelerators, in eight-card nodes
Initial capacitySized against the demand registered on this list, before assembly
Workload profileInference and fine tuning. This is not a frontier model training plant
PowerLocal grid with backup generation. The region's renewable matrix is why we are here, not a claim about this plant
ResearchIdle window open to research institutions in the region
Start of operationAnnounced first to those on the waiting list

Capacity is not yet available for contracting. This page exists to register interest and set the order of the queue, not to sell what does not exist yet.

Who it is for

Institutions that need to treat data sovereignty as a priority.

Anyone already paying for foreign cloud

Companies running inference abroad, paying in dollars, with no control over where the data is processed.

Anyone handling sensitive data

Health, education, legal and public sector, where the origin of processing is a contract requirement and not a technical preference.

Power generators in Brazil

Farms facing transmission constraints that would rather sell to a neighbouring load than watch generation be curtailed by order of the grid operator.

Universities and institutes

Research groups without access to accelerators, who can use the plant's idle window.

Waiting list

Tell us what you need to run. We want to listen.

No commitment and no cost. Before selling anything, we want to understand what you run today, what it costs and what bothers you about it. That is how we size the plant against real demand.

We reply with whatever is already settled on price and timing, plainly, even when the answer is that we cannot serve your case yet.